On January 30, with the cutterhead of the "Chengzi No. 3" shield machine slowly turning, the shield machine on the right line between Ziyang North Station and Baotai Avenue Station of the Ziyang Line of the rail transit line (referred to as the "Zibao shield section") successfully exited the hole, marking the smooth breakthrough of the double line of this section.