Responsive image
The "Chongqing" Railway Hub East Loop Project Qiaopingshan Tunnel successfully penetrated
发布时间:2021-09-15

On September 14, with the last cannon, the longest tunnel on the east ring line of Chongqing Railway Hub, the Qiaopingshan Tunnel, which was constructed by China Railway 20th Bureau, was successfully completed. The overcoming of this difficult point marked the overall construction of the east ring line. A major victory has been achieved, laying a solid foundation for the completion and opening of the whole line.

MODESTY TO WIN THE MARKET AND PASSION TO CREATE THE VALUE
©2010-  Chengdu Alga Engineering New Technology Development Co.,Ltd.
all rights reserved