Responsive image
Liangmu Tunnel in Nanyu High-speed Railway: New equipment is "on duty" to improve construction quality
发布时间:2021-04-21

Recently, at the construction site of LiangMu Tunnel of Nanyu High-speed Railway Project.we can see skilled driver operating a brand new tunnel trench cable grooving machine, cutting rows of small holes under the low side wall of the tunnel second lining.And the commissioning of this new equipment is an innovative application in the construction of tunnel drainage cable groove.

MODESTY TO WIN THE MARKET AND PASSION TO CREATE THE VALUE
©2010-  Chengdu Alga Engineering New Technology Development Co.,Ltd.
all rights reserved